Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): 24102MF35H01
Vendor/Entity Legal Name (if applicable): Binkley & Barfield, Inc.
MWDBE Contracted Goal (if applicable): 19.60%
MWDBE Current Participation (if applicable): n/a
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Binkley & Barfield, Inc. in the amount of $658,887.90 for Professional Engineering Services in connection with Corridor Study - Aldine Mail Route Road - 2023 from Airline Drive to Easthampton Drive, UPIN 24102MF35H01, Precinct 2, MWDBE Contracted Goal: 19.60%.
end
Background and Discussion:
Commissioners Court approved the Harris County Vision Zero Action Plan on September 13, 2022. The Harris County Vision Zero Action Plan has identified corridors and intersections on the High Injury Network to prioritize safety improvement projects. As part of Commissioner Adrian Garcia's Revive2Thrive initiative, Precinct 2 proposed to conduct a corridor study on Aldine Mail Route from Airline Drive to Easthampton Drive (5.6 miles).
Expected Impact:
The Aldine Mail Route corridor study will include extensive public engagement; in-depth safety analysis; and concept development of an inclusive, resilient, and safe corridor. The study will provide engineering solutions for improving safety along the corridor and at intersections for all roadway users, including bicyclists and pedestrians, who are the most vulnerable roadway users. The study will also provide preliminary cost estimates for implementing the preferred corridor concept.
Alternative Options:
Roadway improvements on Aldine Mail Route will be conducted without a concept developed through community engagement and analysis.