Legislation Details

File #: 24-3292    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 5/23/2024 In control: Commissioners Court
On agenda: 6/4/2024 Final action: 6/4/2024
Title: Request for approval to execute a Utility Construction Services Agreement with CenterPoint Energy Houston Electric, LLC., in connection with Sierra Ranch and Stonefield Terrace Sec 3 Subdivisions Drainage Improvements - 2018, with an addition in the amount of $20,382.58, UPIN 19101MF12E01, Precinct 1.
Sponsors: Mony Hossain
Attachments: 1. 24-3292-SOL-UPIN 19101MF12E01_Sierra Ranch_Centerpoint_.pdf
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): UPIN 19101MF12E01
Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC.

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval to execute a Utility Construction Services Agreement with CenterPoint Energy Houston Electric, LLC., in connection with Sierra Ranch and Stonefield Terrace Sec 3 Subdivisions Drainage Improvements - 2018, with an addition in the amount of $20,382.58, UPIN 19101MF12E01, Precinct 1.
end

Background and Discussion:
The Sierra Ranch Drainage project is in Northeast Harris County in Precinct 1. More specifically, it lies to the Southwest intersection of Tidwell Rd and East Beltway 8. The scope of work for this utility agreement includes the excavation and relocation of an existing CenterPoint electric conductor line crossing a proposed detention outfall RCP. An expected 398 ft of line will be buried 8.5ft deep to ensure it is not in conflict with the proposed outfall. The electrical line is in a 14' Utility Easement. The relocation work is being performed to accommodate the drainage improvement project.

Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. This utility agreement is a step in the process to reduce the financial, physical, and emotional burden flood damage places on homeowners and will reduce the financial impact of recovery costs to the Sierra Ranch Project area and Harris County.

Alternative Options:
The only option is to have both parties execute this Uti...

Click here for full text