Legislation Details

File #: 24-3213    Version: 1 Name:
Type: Report Status: Passed
File created: 5/22/2024 In control: Commissioners Court
On agenda: 6/4/2024 Final action: 6/4/2024
Title: Request for approval of Study Report prepared by R.G. Miller Engineers for Spring Stuebner Rd Segment E from 500-ft West of Leitner Way Dr to West of SH99 - 2019, 20104MF1BX01, Precinct 3.
Sponsors: Mony Hossain
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

Project ID (if applicable): 20104MF1BX01
Vendor/Entity Legal Name (if applicable): N/A

MWDBE Contracted Goal (if applicable): Not Applicable
MWDBE Current Participation (if applicable): Not Applicable
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval of Study Report prepared by R.G. Miller Engineers for Spring Stuebner Rd Segment E from 500-ft West of Leitner Way Dr to West of SH99 - 2019, 20104MF1BX01, Precinct 3.
end

Background and Discussion:
The project will expand Spring Stuebner Road into a four-lane concrete boulevard with a 32-foot raised median and an underground storm sewer system to replace traditional ditches and limit swales. It includes a drainage strategy to comply with Atlas 14, proposing a 25% increase in detention capacity and addressing alignment issues due to existing structures and future developments. Plans also feature optimized intersection and median designs for improved traffic flow and safety, alongside new sidewalks on both sides to enhance pedestrian connectivity. This initiative aims to bolster road capacity and infrastructure resilience to meet future urban demands.

Expected Impact:
The designed boulevard is anticipated to greatly improve traffic flow and safety, meeting both current and future transportation needs. With a sophisticated drainage system, it will reduce flooding risks and increase the area's resilience to weather events. Additionally, enhanced pedestrian facilities will boost walkability and accessibility, improving the overall quality of urban life.

Alternative Options:
If study report is not approved the project will not be completed.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public He...