Legislation Details

File #: 24-3115    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 5/20/2024 In control: Commissioners Court
On agenda: 6/4/2024 Final action: 6/4/2024
Title: Request for approval of a change in contract with J Rivas Construction, LLC, in connection with High Meadows and Fairgreen Subdivision Drainage Improvements - 2018, adding three calendar days, with an addition in the amount of $5,820.00, Job No. 23/0157-1, UPIN 19102MF17C01, Precinct 2, MWDBE Contracted Goal: 26.00%, MWDBE Current Participation: 77.90%.
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): UPIN 19102MF17C01 - Job No. 23/0157
Vendor/Entity Legal Name (if applicable): J Rivas Construction, LLC

MWDBE Contracted Goal (if applicable): 26.00%
MWDBE Current Participation (if applicable): 77.90%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with J Rivas Construction, LLC, in connection with High Meadows and Fairgreen Subdivision Drainage Improvements - 2018, adding three calendar days, with an addition in the amount of $5,820.00, Job No. 23/0157-1, UPIN 19102MF17C01, Precinct 2, MWDBE Contracted Goal: 26.00%, MWDBE Current Participation: 77.90%.
end

Background and Discussion:
The High Meadows and Fairgreen Subdivision Drainage Improvements project site consists of subdivision drainage improvements located High Meadows and Fairgreen subdivisions, located west of John F. Kennedy
Boulevard, east of Russ Drive, north of Aldine Mail Route Road and south of Lauder Road., in east Harris County; discharging into HCFCD Channel P138-01-01

The Change in contract request includes the following:

* PCO #7 - Removal and disposal of 8" Asbestos Cement (AC) water line - Upon excavating and exposing the existing 8-inch water line called out to be adjusted, it was determined that it was an AC line that needed special handling and disposal that complies with Hazmat procedures. Added new line item#89 for 32 linear foot of waterline removal and disposal. The total net additional cost is $5,820.00 and 3 days.

Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. Major work activities inc...

Click here for full text