Legislation Details

File #: 24-2714    Version: 1 Name:
Type: Report Status: Passed
File created: 4/24/2024 In control: Commissioners Court
On agenda: 5/7/2024 Final action: 5/7/2024
Title: Request for approval of a study report prepared by Sander Engineering Corporation for North Eldridge Parkway - from South of Pine Drive to South of Lakewood Meadow Drive - 2021, UPIN 22103N306630001, Precinct 3.
Sponsors: Mony Hossain
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

Project ID (if applicable): 22103N306630001
Vendor/Entity Legal Name (if applicable): Sander Engineering Corporation

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval of a study report prepared by Sander Engineering Corporation for North Eldridge Parkway - from South of Pine Drive to South of Lakewood Meadow Drive - 2021, UPIN 22103N306630001, Precinct 3.
end

Background and Discussion:
The County engaged with Sander Engineering Corporation and initiated a professional services agreement in
January 2022, and amended the contract with Sander Engineering Corporation on June 2023 to facilitate the study and design changes associated with expanding the project scope requested by the County. The Study Report is to establish the existing conditions, analyze the impacts of improvements while considering feasible alternatives, and present recommendations. The Project roadway improvement limits are from south of Pine Drive to south of Lakewood Meadow Drive, and drainage improvement limits are from south of Pine Drive to Cypress Park detention pond.

Expected Impact:
Proposed improvements to North Eldridge Parkway include expanding the existing half of the boulevard to complete a full standard four lane concrete boulevard with curbing, storm sewers, curbed median, removal of existing asphalt transitions and left turn lanes.

Alternative Options:
If not approved, consultant will not be able to proceed with Design Phase tasks and may lead to project delays.

Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
_ Flooding
_ Environment
_ Go...