Department: Flood Control District
Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): B509-04-00-E001
Vendor/Entity Legal Name (if applicable): iGET Services LLC
MWDBE Contracted Goal (if applicable): 20.54%
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above
Request Summary (Agenda Caption):
title
Request for approval of an agreement with iGET Services LLC, in the amount of $796,547, for engineering services to provide design, bidding, and construction phase engineering services in support of the Red Bluff Regional Stormwater Detention Basin on HCFCD Unit B509-04-00. (Armand Bayou Watershed, Bond ID C-07, Project ID B509-04-00-E001, Agreement No. 2023-26, Precinct 2, MWDBE Contracted Goal: 20.54%).
end
Background and Discussion:
This agreement will provide engineering services for design and construction of Phase 2 of the Genoa Red Bluff stormwater detention basins. The proposed Genoa Red Bluff stormwater detention basins are located within the Armand Bayou watershed along Spring Gully. The site is partially located within the City of Pasadena. The proposed basins are intended to mitigate the future channel improvements from the City of La Porte's Brookglen Regional Plan. Phase 1 construction has been completed under project B509-03-00-E001.
This project occurs in the 3rd quartile under the 2022 Prioritization Framework approved by Commissioners Court.
Expected Impact:
This project seeks to reduce flood risks and strengthen resiliency in the Armand Bayou Watershed by alleviating property and structural damages to the adjacent communities. The project potentially provides up to 1,352-ac-ft of detention along B109-00-00 with reduced flooding for 523 structures, 6.4 miles of roadway and 215 sq-ft of floodplain area under a 100-yr storm ev...
Click here for full text