Legislation Details

File #: 24-2624    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 4/23/2024 In control: Commissioners Court
On agenda: 5/7/2024 Final action: 5/7/2024
Title: Request for approval to negotiate with Midstream and Terminal Services for professional engineering services in connection with the Investment Estimate - Improvements and Closures of TCEQ Registered Petroleum Storage Tank (PST) Systems, UPIN 24208MF39C01, Countywide.
Sponsors: Mony Hossain
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, Env SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

Project ID (if applicable): UPIN 24208MF39C01
Vendor/Entity Legal Name (if applicable): Midstream and Terminal Services

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval to negotiate with Midstream and Terminal Services for professional engineering services in connection with the Investment Estimate - Improvements and Closures of TCEQ Registered Petroleum Storage Tank (PST) Systems, UPIN 24208MF39C01, Countywide.

end

Background and Discussion:
Harris County currently owns and/or operates forty-four, underground (UST) and aboveground (AST) petroleum storage tank (PST) facilities associated with fuel stations, used oil storage, and emergency generators, that are currently registered with the Texas Commission on Environmental Quality (TCEQ) as either in-service or temporarily out-of-service; see attached exhibit. Many of these registered PST facilities have degraded systems with the potential for a release of petroleum products, are no longer utilized due to problematic or antiquated infrastructure, are in flood prone areas, or no longer meet fueling or operational demands. A comprehensive estimate, based on current costs for engineering, environmental, and construction phase professional and contract services, for the improvements to and/or regulatory closures of the registered PST systems, is recommended to establish the basis for a long-term funding program. Adequate funding within the annual budgets of the Precincts and various Departments which operate many of these critical PST facilities is lacking. The Investment Estimate will prioritize the PST facilities based on the nee...

Click here for full text