Legislation Details

File #: 24-0594    Version: 1 Name:
Type: Grant Status: Passed
File created: 1/22/2024 In control: Commissioners Court
On agenda: 1/30/2024 Final action: 1/30/2024
Title: Request by the Office of the County Engineer for approval to submit an application to the Houston-Galveston Area Council for grant funds in the amount of $48,000,000, with a required match of $12,000,000, for the 2023 Fairmont Parkway Reconstruction project (Precinct 2).
Attachments: 1. 24-0594 signed.pdf
Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, PE, PMP, CFM, County Engineer

Regular or Supplemental RCA: Regular RCA
Type of Request: Grant

Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): N/A

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request by the Office of the County Engineer for approval to submit an application to the Houston-Galveston Area Council for grant funds in the amount of $48,000,000, with a required match of $12,000,000, for the 2023 Fairmont Parkway Reconstruction project (Precinct 2).
end

Background and Discussion:

The proposed Fairmont Parkway Reconstruction project includes widening of asphalt pavement to add 12 ft lanes in each direction (resulting in a 6-lane Blvd), repair existing roadway, four (4) Bridges, reconstruct Willow Spring Bayou Bridge, widen Spring Gully Bridge, widen Big Island Bridge, UPRR Overpass bridge, regrade roadside ditches, construct new sidewalks, modify traffic signals, new signage and pavement markings, driveway construction, and adjust utilities to remove conflict.

Harris County has identified the proposed improvements as a high priority due to the increasing severe daily recurring congestion along Fairmont Parkway. The negative impacts of this congestion extend well beyond the the project area, impacting businesses, residents, and schools. The proposed improvements will reduce traffic congestion and improve safety and air quality. The grant application will seek $48 million of the Department of Transportation's federal funds through the H-GAC with $12 million of local matching funds from Precinct 2 for a total project cost of $60 million.

Expected Impact:

The submission of this project application, under the Houston-Galveston Area Council's 2023 Project Selection Proce...