Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E, PMP, CFM, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): UPIN 19102MF14Q01
Vendor/Entity Legal Name (if applicable): PGAL, Inc.
MWDBE Contracted Goal (if applicable): 31%
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above
Request Summary (Agenda Caption):
title
Request for approval to amend a professional services agreement with PGAL, Inc. for Construction Phase Services in the amount of $49,858.94 for the Recovery and Resiliency Division (RRD) Barrett Station (Phase 2 - Barrett Settlement & St. Charles Place) Subdivision Drainage Improvements, UPIN 19102MF14Q01, Precinct 3, MWDBE Contracted Goal: 31%.
end
Background and Discussion:
Barrett Station (Phase 2 - Barrett Settlement & St. Charles Place) Subdivision Drainage Improvements is located in northeast Harris County in the San Jacinto watershed with a small portion in the Cedar Bayou watershed. It is to the south of Barrett Road, east of Crosby-Lynchburg Road, and north of Cottontail Drive. The existing drainage system is roadside ditches. The proposed improvements are to regrade roadside ditches, upsize culverts to increase capacity, and to construct a detention pond for mitigation.
The additional funds will cover the construction phase services agreement to allow for construction oversight of the project.
Expected Impact:
This project seeks to reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. Engineering support during the construction of the improvements is a step in the process to reduce the financial, physical, and emotional burden flood damage places on homeowners and will reduce the financial impact of recovery costs to the Barrett Station (Phase 2 - ...
Click here for full text