File #: 24-0299    Version: 1 Name:
Type: Grant Status: Passed
File created: 1/4/2024 In control: Commissioners Court
On agenda: 1/9/2024 Final action: 1/9/2024
Title: Request by the Flood Control District for approval to submit an application to the Texas Division of Emergency Management for grant funds in the amount of $32,866,445, with a local match of $10,955,482, for the FY 2023 Cloverleaf Area Drainage Improvements - Phase 2 Program, BRIC-DHS-23-MT-047-00-98. (Carpenters Bayou Watershed, Project ID N100-00-00-E001, Precinct 2).
Department: Flood Control District
Department Head/Elected Official: Tina Petersen, Ph.D, P.E., Executive Director

Regular or Supplemental RCA: Supplemental RCA

Type of Request: Grant

Project ID (if applicable): N100-00-00-E001
Vendor/Entity Legal Name (if applicable): N/A

MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request by the Flood Control District for approval to submit an application to the Texas Division of Emergency Management for grant funds in the amount of $32,866,445, with a local match of $10,955,482, for the FY 2023 Cloverleaf Area Drainage Improvements - Phase 2 Program, BRIC-DHS-23-MT-047-00-98. (Carpenters Bayou Watershed, Project ID N100-00-00-E001, Precinct 2).
end

Background and Discussion:
The proposed drainage improvements project will further reduce riverine flood risk in the Carpenters Bayou watershed. If funded, the Flood Control District plans will utilize available funding in its annual budget as the required local cash match ($10,955,482.00).

Expected Impact:
The project includes the development of design documents for, and construction of, Phase 2 of the Cloverleaf Area Drainage Improvements project. The project will build upon the recommendations put forward in the Preliminary Engineering Report that was completed in August 2022. The Cloverleaf Area Drainage Project will construct drainage ditch improvements, additional subsurface culverts and a new stormwater detention basin to reduce flood risk in this high-density residential area of the County. Phase 1 of this project was funded through a CDBG-MIT grant awarded in 2022.

The Flood Control District will utilize its resources and applicable consultants during the engineering and construction phases of the project, as well as the management of the grant approval process, in compliance with all Harr...